Infinity M30 User Manual

Browse online or download User Manual for Stoves Infinity M30. Infinity M30 User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Infinity
Burnout Furnaces
TM
OPERATOR’S MANUAL
115V, 60Hz Models
Page view 0
1 2 3 4 5 6 ... 31 32

Summary of Contents

Page 1 - Infinity

InfinityBurnout FurnacesTMOPERATOR’S MANUAL115V, 60Hz Models

Page 2 - TABLE OF CONTENTS

1. Turn the power switch on.2. Press PROGRAM NUMBER. Use to display the desired program number (P1 - P30).3. Press ENTER / REVIEW to select th

Page 3 - INTRODUCTION

1. Follow One Stage Program, Steps 1 - 6.2. Press ENTER / REVIEW. STAGE 1 light turns off, STAGE 2 and HEAT RATE lights turn on. Main Display show

Page 4 - SPECIFICATIONS

1. Follow Two Stage Program, Steps 1 - 4.2. Press ENTER / REVIEW. STAGE 2 light turns off, STAGE 3 and HEAT RATE lights turn on. Main Display show

Page 5

OPERATIONPROGRAM AND OPERATE - FOUR STAGE PROGRAM (Figure 1)1. Follow Three Stage Program, Steps 1 - 4.2. Press ENTER/REVIEW. STAGE 3 light turns of

Page 6 - Figure 1

1. Turn the power switch on.2. Press PROGRAM NUMBER.3. Press to select the program number to be reviewed. The PROGRAM NUMBER (P1 - P30) wil

Page 7 - IEC RECEPTACLE

1. To identify which program is running, press PROGRAM NUMBER.NOTE: The program number cannot be changed using while the program is running.

Page 8 - INSTALLATION

NIGHT TIMEDELAY STARTOPERATIONSAMPLE ONE STAGE PROGRAM(To be completed and ready to cast in 24 hours)HEAT RATETEMPHOLD TIMESTAGE 1STAGE 2STAGE 3STAGE

Page 9

To start immediately, press START / STOP.Follow the same programming procedures if a three or four stage program is desired.Press NIGHT TIME (DELAY ST

Page 10 - OPERATION

ERROR CODESNOTE: “Beeps” occur when the Error Code appears on the Main DisplayERRORCODEDESCRIPTIONPROBABLE CAUSEINVALID ENTRYERROR: STAGE,HEAT RATE

Page 11

ERROR CODESEERRRROORRCCOODDEEDDEESSCCRRIIPPTTIIOONNPPRROOBBAABBLLEE CCAAUUSSEESHORTED THER-MOCOUPLE ORDEFECTIVE HEATERPLATESOccurs if the thermocouple

Page 12

1Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2Warrant

Page 13

19CAUTION: The INFINITY should be serviced only by qualified service technicians. Be sure tounplug the power cord and wait for the furnace to cool b

Page 14

201. If a power failure occurs, the Infinity memorizes the conditions prior to the loss of power. When the power returns, the Infinity returns to

Page 15

1. Remove the back panel of the furnace.2. Remove the nuts which hold the heating plate wires to the power terminals and straighten the heating plate

Page 16

INFINITY MINFINITY L22Figure 4INFINITY WITH UPPER REAR PANEL REMOVEDRear Insulating PanelThermocoupleThermocouple ClampCeramic InsulatingBushingInsula

Page 17

1. Remove the front panel (Figure 5).2. Note and record the color and location of each wire on the thermocouple terminals located on the MainPC Board.

Page 18 - ERROR CODES

Figure 5AOTHER COMPONENTS24Figure 5INFINITY WITH FRONT PANEL / MAIN PC BOARD REMOVED

Page 19

1. Remove the bottom front panel and the upper and lower rear panels of the furnace. (Note the position of the vent louvers on the rear panels.)2. Not

Page 20

FIELD SERVICEREPLACEMENT OF THE TRIAC (PN 15475)261. Remove the lower rear panel (Figure 2).2. Note and record the color and location of each of the t

Page 21

27SPARE PARTS LISTDESCRIPTION 115VPower Cord Kit-Japan & U.S. 15288Main PC Board15500-041Heater Jumper 33130Ceramic Front Section 15292Rear Insula

Page 22 - FIELD SERVICE

28SPARE PARTS LISTDESCRIPTION 115VPower Cord Kit-Japan & U.S. 15289Main PC Board 15500-541Heater Jumper 33130Ceramic Front Section (Set of 2) 1529

Page 23 - Figure 4

Thank you for purchasing an Infinity Burnout Furnace. We have designed and manufactured this furnace using the latest in microcomputer technology to

Page 24

PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIM

Page 25 - Figure 5A

PROGRAM CARD FORMSSTAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIMEProgram # Metal(s)STAGE 1STAGE 2STAGE 3STAGE 4HEAT TEMP HOLDRATE TIM

Page 26

Jelrus International, a division of Air Techniques Inc., has been a leading manufacturer ofdental laboratory equipment essential to the fabrication of

Page 27

SPECIFICATIONSINFINITY M INFINITY LElectrical115V 60Hz 1150W115V 60Hz 1610WCapacity8-1 3/4” rings or 2-3” rings15-1 3/4” rings or5-1 3/4” rings and 3-

Page 28 - SPARE PARTS LIST

DISPLAYDESCRIPTION1. NIGHT TIME Press to start a delayed program. The number entered is the time (DELAY START) required for the program to be COMPLET

Page 29

5Figure 1INFINITY M AND L IDENTIFICATION 13101198765124321FrontPanelHeatingChamberVentTubeKEY PARTS IDENTIFICATION AND EXPLANATIONKeep clear 6” zonear

Page 30 - PROGRAM CARD FORMS

KEY PARTS IDENTIFICATION AND EXPLANATIONLOWER BACK PANEL (Figure 2)Figure 2INFINITY LOWER BACK PANEL6DISPLAY DESCRIPTION1. Power Cord AC power cords a

Page 31

1. Unpack the contents of the box. Remove the following materials:A. Vent Tube - Remove from bubble wrap and insert in hole on top of furnace.B. Calib

Page 32

When a program is completed, 20 "beeps" sound every 15 minutes to remind the operator that the material is ready to cast.1. Be sure the Inf

Comments to this Manuals

No comments